


- Saskatoon South-East Water Supply System – Zelma East Facilities
- ED Feehan Heating and Cooling Revisions
- Health Sciences Building B-Wing Renovations
- Holy Cross High School Additions and Renovations
- St. Thomas More Addition
- Marquis Odour Control Facility
- Crossmount Treated Water Pumphouse
- James Smith Cree Nation Water Treatment Plant
- Nutana Collegiate Renovations Phase III
- Bullee Building
- Airport Redevelopment 2012
- Cathedral of Holy Family
- Trinity Manor -Design Build
- Blairmore SPS
- New Project
HOLY CROSS HIGH SCHOOL ADDITIONS AND RENOVATIONS
- Highlights: Mechanical Renovations and Construction
- Location: Saskatoon, Saskatchewan
- Owner: Greater Saskatoon Catholic Schools
- Architect: AODBT Architecture + Interior Design
- Mechanical Engineer: Daniels Wingerak Engineering Ltd.
- General Contractor: Quorex Construction
- Mechanical Contract Value: $4,127,000
Interwest Mechanical Ltd. was the Mechanical Construction Manager for Holy Cross’s renovations. The renovations include a new student common area, an Industrial Arts classroom, as well as many mechanical and architectural upgrades. The major mechanical renovations include the installation of:
- an automated dust collection system in the Industrial Arts facility;
- condensing boilers and associated pumps, piping and heat distribution system;
- air to air heat recovery equipment; and,
- air handling units.
These upgrades were successfully completed while the school was in operation with minimal interruption to the school’s students and facility.